>The company BRI is a limited liability company ...
Ben Rhouma Group companies
 
 References
  • Preparation and putting into place of an electro-filter at SCE
  • Providing, manufacturing and assembly of a whirlwind skirt for Enfidha Cement Company.
  • Providing, prefabrication and assembly of a shaft to Bizerte Cement Company.
  • Providing, manufacturing and assembly of a bandage of Cement oven at Jebel Ouest.
  • Maintenance of SCE Hovercrafts.
  • Maintenance of SCE Cement grinder.
  • Maintenance of SCE Cement separator
  • Maintenance of SCE Conveyors belts
  • Construction and assembly of a condenser balloon to GCT
  • Construction and assembly of an 8 olive oil storage tanks of a diameter of 8350 mm, height 12000 mm at Zarzis Free Zone.
  • Providing and replacement of the cylindrical part of the condenser to GCT
  • Providing, prefabrication transportation and assembly of lifting tower for GCT.
  • Replacement of condenser tubes of the air-condenser to GCT.
  • Providing prefabrication, transportation and assembly of the scroll of the ventilator for GCT.
  • Providing and manufacturing of 02 vacuums of pumps for GCT.
  • Manufacturing of 03 coils of sulphur melting pot D3501 for GCT.
  • Providing and manufacturing of a gas shaft DN 2200 mm for GCT
  • Providing and manufacturing of double piping in envelope for GCT.
  • Renting and installation of scaffolding around the gas shaft and various installations for GCT.
  • Repairing (boards, sandwich panels, eternity plates, polyester plates and ridges) for GCT, SOTACIB, and National Defence Ministry.
  • Sandblasting and painting of various equipment for GCT
  • Providing and manufacturing of main air shaft of 1800 mm for GCT
  • Providing and manufacturing and assembly of a ferrule of bleaching for SOTACIB;
  • Manufacturing of a saturated vacuum pipe HP, for GCT.
  • Assembly plant storage in 2008/2009 for Britsh Gas
  • Mounting Unit grinding petroleum coke in 2009/2010 for POLYSUS
  • Mounting Unit grinding petroleum coke in 2009/2010 for POLYSUS
  • Préfabrication and assembly plant plaster in 2009 for MEDGYP
  • Montage usine de fabrication carrelage monocouche in 2007 GENCAR
  • Study prefabrication plant phosphate transport in 2008 for GCTS
  • Layouts installation conveying wet phosphate in 2007/2008 for GCT
  • Hangar storage with solid sulfur shuttle in 2006 GCT
  • Replacing a metal structure unit Topping in 2010 for STIR
  • Installation conveying and discharging phosphogypsum in 2007 for GCTS
  • Manufacturing and assembly plant filtration unit AAF in 2008 for SCG
  • Palletizing system installation in 2006 for SCG
  • Oil storage tank assembly 8 in 2005 for Borelli
  • Providing, manufacturing and assembly of 02 storage warehouses for ICF.